S6 Słupsk-Bobrowniki Expressway

Design and construction of the S6 expressway on the Słupsk–Bobrowniki section.

The project included the construction of more than 16 kilometres of expressway between the Redzikowo interchange and the Bobrowniki interchange. The section is located in the Pomeranian Voivodeship, within the municipalities of Słupsk and Damnica.

The completed road is a dual carriageway with two lanes in each direction and emergency lanes. Two interchanges were also constructed – Budy and Bobrowniki. As part of the project, Passenger Service Areas in Paprzyce were built on both sides of the route, together with an expressway operation and maintenance facility at the Budy interchange.

The project also included the construction of service and local roads crossing the expressway, as well as wildlife crossings, ecological culverts with protective and guiding fencing, landscaping and expressway fencing, anti-glare screens and noise protection measures.

Ultimately, the S6 expressway, together with the other completed sections, will connect Szczecin with the Tricity.

The total investment cost amounted to almost PLN 550 million.