The consortium, the leader of which is NDI, Sopot-based company , will be responsible for both the design and construction of the S6 road. The investor is the General Directorate for National Roads and Motorways. More than 16 kilometres of the expressway between the junction in Redzikowo and the junction in Bobrowniki are to be implemented. The planned section is located in the Pomeranian Voivodeship, in the municipalities of Słupsk and Damnica.
The road under construction is to be a dual carriageway, with two lanes in both directions and emergency lanes. Two road junctions will also be built - in Budy and Bobrowniki. As part of the investment, on both sides of the route, Motorway Service Areas in Paprzyce and an expressway maintenance section at the Budy junction will be built.
There are also plans for service roads and local roads crossing the future expressway, as well as for animal crossings, ecological culverts with protective and guiding fences, greenery and expressway fencing, anti-glare screens and acoustic protection.
The investment cost is almost PLN 550 million. The contractor has 38 months for its completion.
Ultimately, the S6 expressway (also thanks to other sections under construction) is to connect Szczecin with the Tri-City.