realizations_business_areas

Construction

responsible_companies_label

NDI Energy sp. z o.o.

NDI S.A.

realizations_investor

Centrum Logistyczno-Inwestycyjne Poznań II

status_label

Completed

CLIP Intermodal Terminal

The project included the construction of the southern terminal apron along with the road and track system.

A total of 7 km of new tracks were built, including 15 turnouts. The area of the reinforced concrete terminal slab is as much as 28,620 m2. 4.5 km of catenary networks were also built.

The scope of work also included the removal of system and field conflicts (power, telecommunications and drainage system conflicts, as well as those related to the need to build engineering facilities) and the construction of accompanying infrastructure elements, among others, catenary network, telecommunications, power and drainage ducts, installation of railway weighbridges.


7 kilometers of new tracks 7 kilometers of new tracks 7 kilometers of new tracks 7 kilometers of new tracks


15 turnouts 15 turnouts 15 turnouts 15 turnouts


28620 m2 – terminal area 28620 m2 – terminal area 28620 m2 – terminal area 28620 m2 – terminal area


Investment location

Clip Container Terminal

Jasin