Construction

specializations_label

Road infrastructure

responsible_companies_label

NDI S.A.

realizations_investor

Generalna Dyrekcja Dróg Krajowych i Autostrad

status_label

In progress

Pradła bypass

The scope of the contract includes the construction of the DK78 bypass, including the construction of a single-carriageway GP class road (main expressway), adapted to bear a load of 11.5 tonnes/axle, as well as the construction of additional carriageways in the right of way to service the adjacent area and to enable access to facilities related to road maintenance.

The bypass will be over 2 km long and will circle the town from the north. A roundabout-type intersection will be built along with the alteration of the existing section of DK78 with a length of approximately 1.2 km. A drainage system will be built along with road ditches, sections of the storm sewer system, retention reservoirs and devices for pre-treating rainwater and thawwater, which will be drained from the road area.

The construction of the bypass also means new sidewalks, pedestrian and bicycle paths and exits, as well as vehicle inspection bays on both sides and road safety devices. New engineering structures will be built, including an overpass over the DW794 provincial road and a bridge over the Krztynia River along with an animal migration route.