In September 2016, NDI SA launched construction works to renovate selected tracks and rail crossings located in Basen Górniczy in the Port of Gdańsk. The length of the reconstruction is about 3 km.
The scope of works involved:
• reconstruction of the track surface at the length of about 1.916 km,
• replacement of 3 junctions,
• replacement of the road surface of 4 passages.
The investment ended in February 2017.


