Gas pipeline construction

Poland – Lithuania

Konopki – Kuków

2020-2022
A consortium of companies led by NDI Energy Sp. z o.o. is commissioned by GAZ – SYSTEM to carry out construction works related to the second part of the northern section of the Poland – Lithuania gas interconnection.

The Task 2 gas pipeline route, with a length of approx. 77 km, Konopki – Kuków, will run through 2 voivodeships:

  • Podlaskie Voivodeship in the communes of: Grajewo, Rajgród, Raczki, Bakałarzewo, Suwałki,
  • Warmińsko-Mazurskie Voivodeship in the communes of: Prostki, Kalinowo.
  • The aim of the project is to build a new cross-border gas pipeline with the infrastructure necessary for its operation (including, i.a., a fibre optic cable), which will connect the natural gas transmission systems of Poland and Lithuania, which will contribute to the integration of the transmission systems and gas markets of the Baltic countries. In addition, the construction of the gas pipeline will enable the gas supply to the Polish regions so far without access to natural gas.

    NDI Energy Sp. z o.o. – Consortium Leader, NDI Sopot S.A. and NDI Sp. z o.o. General Contractor NDI Energy Sp. z o.o. – Consortium Leader, NDI Sopot S.A. and NDI Sp. z o.o.
    Operator Gazociągów Przesyłowych Gaz System S.A Investor Operator Gazociągów Przesyłowych Gaz System S.A
    2020 – 2022 Project's execution 2020 – 2022
    about 77 kilometres
    length of the gas pipeline section
    700 millimetres
    diameter of the gas pipeline