54-kilometer-long high-pressure gas pipeline from Gustorzyn to Leśniewice will be built. It will be used for gas transmission towards the Warsaw and Łódź agglomerations and to Radom and its surroundings, as well as to the south-eastern regions of the country. NDI Energy became the contractor for the investment.
The investment includes not only the construction of the gas pipeline. The development of the Gustorzyn gas distribution point and the construction of the switching system are also to be performed. The plans also include a cable ducting with optical fibre with a length of about 54 kilometres and the blocking and bleeding system ZZU Przydatki
The investment cost is almost PLN 250 million. The investor is Operator Gazociągów Przesyłowych Gaz-System S.A.


